Bathrooms · Dublin 6, Dublin

Bathroom Renovations in Dublin 6.

Plumbing, tiling, showers, wet rooms and ensuites — finished by one team. Run in-house by Marcin's team across Dublin 6 and the wider Dublin area.

Bathroom Renovations in Dublin 6: Marble-tiled bathroom with backlit round mirror and pedestal basin

Dublin 6 · The area

Why bathroom renovations in Dublin 6 are a familiar brief.

Dublin 6's Victorian and Edwardian red-brick terraces share a bathroom typology distinctive enough we recognise it on plan: a single principal bathroom at the rear, typically over the kitchen, with the soil stack running externally down the back facade and a lead or early-copper supply line under the floorboards. The most common brief here is a strip-out that reroutes plumbing internally so the rear elevation can be left clean, an ensuite added to the principal bedroom (often partitioned out of a former dressing room or large landing), and large-format porcelain or stone tiling installed over correctly tanked board. The 9-inch solid brick walls limit where new waste runs can travel, so the layout is worked out on paper in detail before any strip-out starts. Almost every D6 bathroom job needs to coordinate with the conservation overlay on the front rooms as well, even though the bathroom work itself is rear-of-house. The front-elevation soil stack reroute is the part that most often touches planning.

Bathroom Renovations · How we run it

Bathroom Renovations in Dublin 6, the way it should be done.

A bathroom is the room a client uses twice a day, and the one most likely to leak twice a year if it is not done properly. We renovate bathrooms across Dublin and Leinster the way they should be done — strip-out to base, first-fix plumbing tested under pressure before a single tile is laid, full tanking on every wet surface, and a tile plan drawn out and confirmed in advance so cut tiles never land in eyelines.

Every bathroom renovations project in Dublin 6 is run personally by Marcin's in-house team — site visits within the working week on the Dublin side of the city, and same-day answers on WhatsApp. For the full detail on how we approach bathroom renovations — process, specification and certification — see the bathrooms service page.

Full bathrooms detail & process →

Bathrooms in Dublin 6

Common questions about bathroom renovations in Dublin 6.

Yes. Dublin 6 is a regular service area for us. Renovations, extensions and bespoke joinery across Dublin 6 — Rathmines, Rathgar, Terenure, Harold’s Cross. Victorian and Edwardian red-brick terraces, period semis and the careful renovation work they deserve. If your project sits in this area we will arrange a site visit, give you an honest indication of scope and timeline at the first meeting, and follow up with a written fixed-price quotation.

A standard full bathroom strip-out and refit runs 3 to 5 weeks from the day the skip lands. Principal bathrooms with wet rooms, custom joinery or non-standard tiling can run 6 to 8. We give a written schedule with your quotation and update it weekly during the build.

Yes. All three are run by our own team. That means no waiting on an outside plumber, no finger-pointing if something needs adjusting later, and one point of contact (Marcin) from quote to handover.

Bathrooms · Dublin 6

Planning bathroom renovations in Dublin 6?

Same-day replies on WhatsApp. Calls and emails answered within one working day.